Case Study

Active Sediment Cap Included In Clean-Up Strategy At High-Profile Superfund Site

Active Sediment Cap Included In Clean-Up Strategy At High-Profile Superfund Site

Pages 2 Pages

PROJECT CASE STUDY PROJECT CASE STUDY www.cetco.com Active sediment cap included in clean-up strategy at high-profile superfund site Historical operations at the BROS Super-fund Site included waste oil storage, processing and disposal. The waste oil operations in addition to a major earthen dike breach in the 1970’s resulted in extensive damage to plant life and significantly impacted approximately three acres of the swamp. The wastes, which c

Join for free to read