Case Study

AccuWave EM System and Blue Force Motor Reduced Drilling Time 64%, Saved $956,000

AccuWave EM System and Blue Force Motor Reduced Drilling Time 64%, Saved $956,000

AccuWave EM System and Blue Force Motor Reduced Drilling Time 64%, Saved $956,000 www.nabors.com Challenge ? ? Goal—reduce previous drilling time and costs in 3 horizontal well program in the Wolfcamp shale Solution ? ? Use Ryan Directional Services 6¾ in. short-bit-to-bend Blue Force motor line and AccuWave EM MWD system for enhanced positional awareness Results ? ? Reduced drilling time 64% ? ? Drilled 40,713 Ft. in 10.88 days (spud to

Join for free to read