ABI Equipment Limited was asked to supply specialist piling equipment consisting of two ABI Mobilrams, a TM14/17V and a TM16/20B, running VDW double a
ABI Equipment Limited was asked to supply specialist piling equipment consisting of two ABI Mobilrams, a TM14/17V and a TM16/20B, running VDW double a
ABI Equipment Limited was asked to supply specialist piling equipment consisting of two ABI Mobilrams, a TM14/17V and a TM16/20B, running VDW double auger systems. The piling works were carried out over a number of weeks between the time period July 2015 and January 2016. Walney Onshore Substation, Heysham Main Contractor: Amey Client: Dong Energy Piling sub-contractor: Deep Soil Mixing Ltd Piling Equipment supplier: ABI Equipment Limited In addition ABI Equipment supplied two grout batching plants manufactured by the German manufacturer STS Scheltzke GmbH together with flow meters and data recording systems. Each rig was customised to include new depth measuring systems, automated feeding control and additional feedback for the operator