Case Study

ABB drives save £25,000 on energy at duck processing plant, Cherry Valley Farms

ABB drives save £25,000 on energy at duck processing plant, Cherry Valley Farms

Pages 2 Pages

Case note ABB drives save £25,000 on energy at duck processing plant An investment of £16,000 is bringing a £25,000 per year energy saving. Cherry Valley Farms is the largest manufacturer of duck and duck products in the UK, processing 45,000 ducks per day. Each duck is chilled so the chilling plant is a major part of the factory’s operation and accounts for a high proportion of its operating costs. Cherry Valley wanted to explore ways of red

Join for free to read