Case Study
A WTW in North Wales: Flow control of raw water entering the treatment process
CASE STUDY Case Study: A WTW in North Wales Application: Flow control of raw water entering the treatment process Key facts: Difgen model: DG13-14 • Differential pressure: 9-10.5bar • Flow range: 10-30l/s • Power output: 8-17kW • Annual revenue: GBP 29,000 • Payback period: 2.8 years • Background: The Pen y Cefn water treatment works is gravity-f