Case Study

A waterproofing solution was required for Aqua Sana, thenew luxury health spa at Center Parcs Woburn.

A waterproofing solution was required for Aqua Sana, thenew luxury health spa at Center Parcs Woburn.

PEACE OF MIND GU AR ANTEED CASE STUDY Cast Contracting Ltd 012 56 763100 info@ccl-ltd.net www.ccl-ltd.net Lodge Farm Hook Road North Warnborough Hook Hampshire RG29 1HA Center Parcs, Woburn Forest A waterproofing solution was required for Aqua Sana, the new luxury health spa at Center Parcs Woburn. CAST CONTRACTING LTD THE CHALLENGE Woburn Forest is the newest Center Parcs village to be built in the UK and is situated only an hour from London in a stunning 365 acre woodland site. The village contains all of the Center Parcs attractions including the largest state-of-the-art Subtropical Swimming Paradise and the luxury Aqua Sana Spa. RIW Specialist Waterproofing Contractor Cast Contracting Ltd (CCL) were awarded the prestigious project by Bowmer & Kirkland to supply a

Join for free to read