Case Study

A primary school was to be built next to a recently completed secondary school to create an all-through academy.

A primary school was to be built next to a recently completed secondary school to create an all-through academy.

CASE STUDY CASE STUDY Isaac Newtown Academy / Ilford (UK) / Architect : Pollard Thomas Edwards / Installer : Clarke Facades ©Hufton+Crow ©Mitchell Duncan & Associates LimitedCASE STUDY 2 A primary school was to be built next to a recently completed secondary school to create an all-through academy. Everlite Concept’s Danpalon BRV rainscreen played a major role in achieving a bold visual impact, maximising the use of space and shielding the school from a noisy urban environment. The Isaac Newton Academy is located in a busy urban location in Ilford. A non- denominational, non-selective school and welcomes students from all backgrounds and sections of the local community. Its purpose built secondary school opened in 2012 with 180 students. By 2018 there will be 1,250 students, with

Join for free to read