Case Study

A Powerful Case For Infrared Windows

A Powerful Case For Infrared Windows

Pages 7 Pages

iriss.com Case Study A Powerful Case For Infrared Windows A Powerful Case For Infrared Windows Overview: A regional Power Generation Facility had been tasked by their insurance carrier to perform regular preventive maintenance on the switchgear within their facility. Unfortunately, regular downtime was not a practical option for them as the processes required to do the live inspections were hazardous and required more manpower and resources than they had to provide. In addition, they too were feeling the pressure of the requirements of NFPA 70E and were starting to re-think their strategy since inspections of energized equipment was becoming more restrictive, more time consuming and more costly. By Martin Robinson, CMRP Level III Thermographer President, IRISS Inc.iriss.com Case St