Case Study

A manufacturer of impellers had problems with both inconsistent material quality and long lead times.

A manufacturer of impellers had problems with both inconsistent material quality and long lead times.

Pages 1 Pages

Impeller Industry Pump and Compressor Dura-Bar Grade 65-45-12 Ductile Iron Original Material Iron Sand Castings Problems Solved Material Quality, Machinability, Reduced Scrap A manufacturer of impellers had problems with both inconsistent material quality and long lead times. The iron sand castings they were using had porosity, so Dura-Bar was a natural alternative due to no sand in the process. Because the impeller is made in multiple lengths, a custom near-net shape from Dura-Bar meant no more pattern costs or long lead times. Superior machinability was an additional benefit, with faster cy cle times and ultimately significant cost sa vings. The conversion to Dura-Bar made a dramatic difference for this customer, with improvement in cost, consistent quality, ma

Join for free to read