Case Study
A Hull of Epic Proportions
for mold preparations and a steel frame to support each of the hull halves was designed and fabricated to enable the molds to be positioned on their sides. When the infused halves had fully cured, they were aligned and irrevocably joined by an infused patch that runs the length of the keel. The VE/VIP System Buck Younger, Intermarine’s vice president, new boat construction, says previously their company used traditional hand lay-up for major