Case Study
A Concrete Manufacturer Had An Emergency Rebuild Of A Critical Conveyor, Which Required A Sprocket
Challenge • A concrete manufacturer needed to complete an emergency rebuild of a lime conveyor critical to plant operation. • In order to operate the conveyor and resume operations, the manufacturer needed a Roller Chain Sprocket immediately. Solution • Acting quickly to help the client minimize downtime and lost productivity, pulled a Sprocket from its large inventory of stock Roller Chain Sprockets. • The team altered the Roller Chain Sprocket for the appropriate shaft size within just a few hours. Impact • The fast delivery of the Roller Chain Sprocket allowed the conveyor to resume operations, avoiding approximately 12 hours of production downtime. Industry: Cement & Aggregate • A concrete manufacturer had an emergency rebuild of a critical conveyor, which required a