A BI Equipment Limited was chosen to supply specialist equipment consisting of a Delmag RH34 rig by contractor PJ Edwards Ltd for the piling work on t

A BI Equipment Limited was chosen to supply specialist equipment consisting of a Delmag RH34 rig by contractor PJ Edwards Ltd for the piling work on t

The contact involved the installation of bridge abutment and wing wall piles on the Heads of Valley A605 road widening project. The pile installation encompassed the risk of old mine workings, artesian water strikes and the penetration of the very tough and variable ground conditions. The piles were installed through superficial glacial deposits and socketed into the underlying mudstones and sandstones of the Lower Coal Measures Group. The bedrock occurred with intervening bands of very strong ironstone and coal seams. The whole area was described as a shatter zone associated with the adjacent Tredegar geological fault. The total number of piles consisted of: 33 No OD1300mm; 102 No 1200mm and 103 No OD1000mm using segmental casing and rotary b

Join for free to read