Case Study

800 MW Supercritical Coal-fired Power Plant Achieves Smooth and Rapid Plant Commissioning

800 MW Supercritical Coal-fired Power Plant Achieves Smooth and Rapid Plant Commissioning

Pages 2 Pages

Location: Order Date: Completion: Industry: Yonghung, Korea 2001 2004 Power http://www.yokogawa.com/suc/ 800 MW Supercritical Coal-fired Power Plant Achieves Smooth and Rapid Plant Commissioning Using a Full-replica Plant Simulator/Korea South East Power Co., Ltd. SUCCESS STORY Executive Summary Faster , smoother plant commissioning