Case Study

8-5/8” ESET Liner extends 10- 3/4” MLT liner, saves hole section and allows for planned solution in reservoir

8-5/8” ESET Liner extends 10- 3/4” MLT liner, saves hole section and allows for planned solution in reservoir

Pages 1 Pages

Enventure Global Technology 15995 North Barkers Landing, Suite 350 | Houston, Texas 77079 Tel 281.552.2200 | Fax 281.552.2201 | www.EnventureGT.com ©2018 Enventure Global Technology Enventure and SET are trademarks of Enventure Global Technology All Rights Reserved. Ver01 08/18 PERFORMANCE 8-5/8” ESETTM Liner extends 10- 3/4” MLT liner, saves hole section and allows for planned solution in reservoir Challenge Aker BP encountered a restriction 118m (387 ft.) off bottom while running a 10-3/4” MLT liner. This was the third attempt to pass the trouble spot. The decision was made to cement the MLT liner in place and find an alternative way to cover up the troublesome Balder formation and part of the main injectite, while still able to keep the planned 5-1/2” screens across th

Join for free to read