Case Study
66 Plugs Drilled in Permian Basin Well in a Single Run with a HydroPull™ Tool
Case History: HydroPull™ 66 Plugs Drilled in Permian Basin Well in a Single Run with a HydroPull™ Tool Case Study, Spraberry Trend, Midland County, TX • Casing 5 1/2-in. 20 lb./ft. • KOP 8,400 ft. TVD; PBTD 19,331 ft. MD • 2 5 /8-in. Coil Tubing • 66 Composite Plugs This job with a major Permian Basin operator involved milling out a total of 66 composite bridge plugs from a 10,000 ft. lateral in a 19,331 ft. MD horizontal well. The liner was 5