6 & 7 New Bridge Street Burgin Contracting has achieved a 70 percent time saving on an electrical installation for prestigious central London offices by using Klin 7 pin. The installation at 6-7 New Bridge Street in Central London has used Klin 7 pin from the distribution boards right through to final luminaires and lighting control. The prefabricated wiring system also provides power to fan coil units throughout the seven-storey building. Andy Collinge, electrical operations manager for Burgin stated “The system has saved us signifacant time in the first fix because there are fewer hard wired connections to make. This labour saving translates into a cost saving on the job making us more competitive in the tender. “In addition there will be significant savings when it comes to in