Case Study

5,000kJ Rockfall Barrier (Bespoke)

5,000kJ Rockfall Barrier (Bespoke)

Pages 1 Pages

Client: Main contractor: Date of construction: Engineer: Products used: © 2010 Maccaferri. All rights reserved. Maccaferri will enforce Copyright. CASE HISTORY CH-INT-RF058-IT Rev:02, Nov2012 ROCKFALL PROTECTION Product: OM CTR 50/07/A (5000kJ MEL) 5,000kJ ROCKFALL BARRIER (BESPOKE) ARVIER (VALLE D’AOSTA) - ITA Problem Regional Road SR n.25 (Valle d’Aosta) around chainage km 4.0 have a long history of rockfall problems. In 2010 an

Join for free to read