Case Study

400FLEX10 Pump Increased Uptime by 500% for Oklahoma Operator

400FLEX10 Pump Increased Uptime by 500% for Oklahoma Operator

Pages 1 Pages

Case History An Oklahoma operator’s well experienced excessive downtime and lost production with an existing electrical submersible pumping (ESP) system. Additionally, the ESP system maintained a high ? uid level, which produced less-than-optimal drawdown and productivity. The operator requested a system solution from Baker Hughes Arti? cial Lift Systems, and required an ESP system that could ride through the gas-related shutdowns. Syst

Join for free to read