Case Study

4 Nederrijn Measures-Room For The River

4 Nederrijn Measures-Room For The River

Pages 2 Pages

PROJECT SHEET 4 NEDERRIJN MEASURES ROOM FOR THE RIVER DETAILS Client Directorate-General for Public Works and Water Management [Rijkswaterstaat] Location Elst (U), Lienden, Doorwerth Period 2011 - 2014 Contractor Boskalis Nederland B.V. Type of contract PD&C INTRODUCTION Within the governmental programme Room for the River, in more than thirty places the Rhine, IJssel, Waal, Nederrijn and Lek are getting more space. Boskalis was commissioned by Rijkswaterstaat to work along the Nederrijn. PLAN, DESIGN & CONSTRUCT (PD&C) For the first time in water-related engineering, plan study, design and realisation are integrated into one assign- ment: creating support in the surroundings, proceeding with the approval process, developing spatial quality and realisation. In all phases we have

Join for free to read