3M Corporate Headquarters

3M Corporate Headquarters

Industrial Water Division Case Study 3M Corporate Headquarters 2014 V1.0 Introduction Creative Water Solutions LLC and 3M conducted a 2 year trial of ProMossTM treatment at their corporate campus cooling towers. The purpose of the study was to determine the effect of ProMossTM on water chemistry, bacterial load, organic contamination, water use, scaling, corrosion, turbidity and conductivity. The 2 towers selected for the trial were 7000 ton structures made from wood and galvanized steel. The ProMossTM treated tower was 3, 3A and 4 – the control tower was 5, 6 and 6E. Due to the cool summer, the control tower was not running approximately 80% of the trial, while the ProMossTM tower was running all summer. The ProMossTM tower