38.5 MW Sleaford Biomass Power Plant under construction, Lincolnshire, the UK
Burmeister & Wain Scandinavian Contractor A/S Your Global Energy Partner 38.5 MW Sleaford Biomass Power Plant under construction, Lincolnshire, the UK April 2013 Burmeister & Wain Scandinavian Contractor A/STHE UK’S LARGEST STRAW-FIRED BIOMASS PLANT TO DATE Sleaford Straw-fired Power Plant PROJECT DESCRIPTION The Sleaford Biomass Power Plant is a 38.5 MW straw- fired Combined Heat and Power (CHP) plant currently under construction in Sleaford, Lincolnshire, in the eastern part of England. The straw-fired power plant is being constructed on a full turnkey basis by Burmeister & Wain Scandina- vian Contractor A/S (BWSC), in a consortium with the boiler manufacturer Burmeister & Wain Energy A/S (BWE). As consortium leader, BWSC is responsible for the coordination of all technical and c