Case Study
345kV - Rating Study & Tower Raising Project
345kVRating Study & Tower Raising Project 345kVRating Study & Tower Raising Project, Illinois 345kV L11212 & L8012 (50) Mile Lattice Tower Upgrade The purpose of this project was to upgrade an existing (50) mile 345kV lattice tower line with double bundled conductor, through a combination of nips, tucks, floating dead-ends, and tower raising. Project Scope: Work entailed modeling the existing line in PLS-CADD, using LiDAR survey. The desire