Case Study

3-Stage Ship Lift: SH Series Brakes

3-Stage Ship Lift: SH Series Brakes

Application Profile SH Series Brakes 3-Stage Ship Lift Product Application P-8555-SG 7/18 Stromag was chosen to supply accurate braking systems for the three-stage ship lift at the Goupitan Dam in China. The 763 ft. (232.5 m) high dam is located on the busy Wujiang River, a tributary of the Yangtze River. The dam utilizes five turbines that can generate up to 3,000 MW of power. A series of three separate ship lifts were constructed to acco

Join for free to read