Case Study
$2.9 Billion Specialty Chemicals Leader Accelerates Mission-Critical Systems 50-75% while Bolstering DR
$2.9 Billion Specialty Chemicals Leader Accelerates Mission-Critical Systems 50-75% while Bolstering DR
Manufacturing www.zeonchemicals.com Challenge When ZEON planned a DR location in Texas, IT leader shied away from the incumbent storage solution because of latency on business- critical applications. Results • 50-75% lower latency on mission-critical applications • 75% less storage management time • Higher performance and capacity for a lower TCO • VM creation in less time • 2.5 to 1 capacity “Before, SAP was slow enough that they couldn’t get their work done. Now we have no hang-ups with getting shipments out and have seen a 50- 75% lower latency in business-critical applications.” Jerry Divino Infrastructure Manager Company Challenge Latency That Threatens Shipping A world leader in specialty elastomers, polymers, and chemicals, ZEON reports annual global sales of more tha