Case Study
251 Newington Causeway
ANHYDRITEC Tel. 01925 428780 E. sales@anhydritec.com 221, Europa Boulevard, Warrington WA5 7TN (CS001) Case Study www.gy vlo n. co m – ww w. an hydr ite c. c om Project Information Type of Project: Private Residential Development 47n floor high rise Project name: 251 Newington Causeway Date: 16 th March 2018 Location: Elephant and Castle London Applied m 2 : 35,000 m2 Technology applied: Thermio/XTR Substrate: 50mm thick floating floor on insulation Screed supplier: Tarmac Silvertown Screedlayer: TCS Screeding Other: 42 floors. Thermio to go 30 floors up The challenge To pump Thermio over 20 floors. TCS took the challenge on and proved successfu