Case Study
16 Robots Replacement
www.beck-pollitzer.com Toyota Motor Manufacturing France Call us now on 08448475413 16robotsreplacement(SSD2016) SummerShutdown2016 B&P had to remove 16 robots from the existing line and install new robots. Due to the shutdown, B&P had 7 days (from Saturday 30th of July to Friday 5th of August). Therefore, an important preparation has been done in terms of organization, method statements and H&S. The method was different depending on access and