Case Study
15 Corrugated Cases/Minute to 60 With a $240,000 Savings
15 Corrugated Cases/Minute to 60 With a $240,000 Savings Eric Toth If your business has a production line, rest assured you are always on the lookout for ways to optimize them. Sometimes the one thing that’s needed isn’t to optimize the line, but instead to change the nature of the pack. After experiencing issues with older equipment, a Midwest food manufacturing customer was open to discussions on how they could reduce downtime. Instead of exploring a new piece of the same kind of equipment from the start, our solution provider asked a few questions. After some discovery one big question arose; What if we could run a package without the need for corrugated and glue? What did our customer stand to gain from changing the nature of their pack? Corrugated Reduction Numerous companies are swit