Case Study
138kV - Collins Ferry - Lake Lynn Reconductor
138kV Collins Ferry Lake Lynn Reconductor 138kV Collins Ferry Lake Lynn Reconductor This project included the reconductor of (6.8) miles of 138kV between Lake Lynn and West Run Substations. After modeling the proposed conductor, Realtime performed an in- depth analysis of the existing steel lattice structures and arrived at the following scope of work: Replacement of existing ACSR conductor with 556 kcmil ACSS/TW (HS285) Dove, while the