Case Study

132kV Protection, Synchronising And Metering Cubicles

132kV Protection, Synchronising And Metering Cubicles

Background: Diamantina Power Station (DPS) was constructed to provide high reliability power supply to the local industry and the city of Mt Isa. Leichhardt Power Station provides a standby power plant, to be utilised in the situation where the available capacity from DPS is less than that required to meet the obligations under it’s off take agreements. For Leichhardt Power Station, Welcon produced the 132kV secondary system design,

Join for free to read