Case Study

11-15 Monument Street, London

11-15 Monument Street, London

Pages 1 Pages

Swantest were contracted by McGee ’s at No. 11-15 Monument Street, to conduct a floor loading test on an existing clay pot floor slab. The purpose of this test is to determine the safe working load capacity of existing slabs – whether this be for supporting machinery or plant during demolition or to assess a slabs capability to support additional loads in a change of purpose situation. The aim of this test was to determine if the slab wa

Join for free to read