Case Study

‘1 month payback period’

‘1 month payback period’

Pages 1 Pages

www.aesseal.com ‘1 month payback period’ Industry: Bio-ethanol Product: DMSF & SP3 System Application: Stillage Duty MTBF Increase: 500% (and counting) Savings: £464,035 Reference N.O: CH01154 DMSF upgrade saves over £460,000 a year One of the largest Bioethanol production plants in Europe was having a failure every 2 months on a group of pumps in the distillation area of the plant, costing over £75,000 per outage. The pumps are in a

Join for free to read