Case Study
1 Ecoskid 14 modules L1B35 - 64 m²
HEADWORKS BIOLOGY SEPARATION MEMBRANE DISINFECTION BIOSOLIDS SYSTEMS CASE STUDY GRANDVAUX, France (39) Eco-Friendly Safe Economical Energy Efficient 1 Ecoskid TM 14 modules L1B35-64 m² 1,000 m 3 /day Raw water origin : ground and surfaceThe two sources of Gorges and Coupet, with a dry weather flow of 400 m 3 /day, supply the region of St. Lupicin. The rest is provided by pumping from the “Abbaye” lake. The water has variable characteristics in